construction specification 32—structure concrete

Construction Specification 32—Structure Concrete

Construction Specification 32—Structure Concrete . 32–2 (210–VI–NEH, January 2014) ... any condition that might adversely affect the hardening of the concrete. Steel tying and form construction adjacent to concrete in place shall not be started until the concrete has cured ...

get price

Construction Specification 32—Structure Concrete

Construction Specification 432—Structure Concrete Steel Reinforcement 1. Scope The work shall consist of furnishing, forming, placing, finishing, and curing Portland cement concrete and furnishing and placing steel reinforcement as required to build the structures shown on the drawings. 2. Materials

get price

Construction Specification 32—Structure Concrete

Construction Specification 32—Structure Concrete Author: npss Description: generated by an Adobe application Last modified by: paula.baty Created Date: 1/14/2008 3:30:00 PM Company: npss Other titles: Construction Specification 32—Structure Concrete

get price

Construction Specification 32—Structure Concrete

Concrete for structure concrete shall be classified as follows: Class of Maximum net Minimum concrete water content cement content (gal/bag) (bags/yd3) 3000M 6 5.5. 4000M 6 6. 4. Air content and consistency. Unless otherwise specified, the slump shall be 3 to 5 inches. If air entrainment is specified, the air content, by volume, shall be 4 to 7 ...

get price

Construction Specification 32—Structure Concrete

National Standard Construction Specifications Chapter 2 (210-VI-NEH, May 2001) 1. Applicability Construction Specification 32 is applicable for the installation of low and moderate hazard struc-tures, where the quantity of concrete is generally 75 cubic yards or less per structure, and where the location of the structure will allow economi-

get price

MINNESOTA CONSTRUCTION SPECIFICATION 32-

MINNESOTA CONSTRUCTION SPECIFICATION 32--STRUCTURE CONCRETE Author: heleneler Last modified by: Holter, Lea - NRCS, St. Paul, MN Created Date: 9/25/2006 7:35:00 PM Company: USDA Other titles: MINNESOTA CONSTRUCTION SPECIFICATION 32--STRUCTURE CONCRETE

get price

Construction Specification 32—Structure Concrete

National Standard Construction Specifications Chapter 2 (210-VI-NEH, May 2001) 1. Applicability Construction Specification 32 is applicable for the installation of low and moderate hazard struc-tures, where the quantity of concrete is generally 75 cubic yards or less per structure, and where the location of the structure will allow economi-

get price

MINNESOTA CONSTRUCTION SPECIFICATION 32-

MINNESOTA CONSTRUCTION SPECIFICATION 32--STRUCTURE CONCRETE Author: heleneler Last modified by: Holter, Lea - NRCS, St. Paul, MN Created Date: 12/7/2015 6:36:00 PM Company: USDA Other titles: MINNESOTA CONSTRUCTION SPECIFICATION 32--STRUCTURE CONCRETE

get price

Construction Specification - Structure Concrete

Construction Specification 32. STRUCTURE CONCRETE . 1. SCOPE. The work shall consist of furnishing, forming, placing, finishing, and curing portland cement concrete as required to build the structures described in Section 24 of this specification.

get price

Construction Specification 32—Structure Concrete: 1. Scope ...

This specification shall be used for all reinforced concrete within the Construction Plans. Reinforcing steel shall be US Grade 60, or higher, deformed bars. Reinforcing steel shall be free from loose rust, concrete, form oil, grease, paint, or other deleterious coating.

get price

Construction Specification 65—Articulating Concrete Block ...

Concrete or grout—Concrete or grout for filling voids must conform to Construction Specification 31, Concrete for Major Structures or Construction Specification 32, Structure Concrete as specified. Geogrid—Biaxial geogrid must meet the requirements in section 7.

get price

Part 642 Specifications for Construction Contracts

32—Structure Concrete 1/09 1/09 ... 42—Concrete Pipe Conduits and Drains 1/09 5/01 43—Clay Pipe 1/09 5/01 ... construction specifications are in chapter 2 of this handbook. National standard material specifications are in chapter 3. These specifications will be modified

get price

Construction Specification 65—Articulating Concrete Block ...

Construction Specification 23, Earthfill, may be needed if there is a substantial amount of earthfill required. Construction Specification 31, Concrete for Major Structures, or Construction Specification 32, Structure Concrete, should accompany Construction Specifica-tion 65 whenever concrete or grout will be used to fill seams and other voids.

get price

Instructions for use Construction Specifications 13—Piling

Construction Specification 13: 511—Steel Piles 512—Wood Piles 513—Precast Concrete Piles 514—Cast-in-Place Concrete Piles Include Construction Specification 31, Concrete for Major Structures, or 32, Structure Concrete, as ap-propriate, when not included in the contract for other concrete installation. 3. Included items

get price

Construction Specification 21—Excavation

the standard specification includes more than one method. n. Requirements for concrete to fill voids from overexcavation (refer to Construction Specification 31, Concrete for Major Struc-tures, or 32, Structure Concrete) if require-ments in section 8 are not adequate. 4. Methods Section 4, Use of excavated materials

get price

Technical Construction and Material Specifications and ...

NRCS Aspring Wetland Restoration Project 3-1 August 2016 Hendry County, FL Construction Specification 3—Structure Removal 1. Scope The work shall consist of the removal, salvage, and disposal of existing culverts and pumps

get price

MNcs032.doc - Minnesota Construction Specification 32 ...

Minnesota Construction Specification 32--Structure Concrete 1. SCOPE The work shall consist of furnishing, forming, placing, finishing and curing portland cement concrete and the furnishing and placing of steel reinforcement as required to build the items named in this specification or shown on the drawings. 2. MATERIALS Portland cement - ASTM C 150, Type I or Type II.

get price

LIST OF CONSTRUCTION SPECIFICATIONS and

Construction Specification Name Number Stripping, Stockpiling, Site Preparation and 752 Spreading Topsoil Structure Concrete 32 Structure Removal 3 Temporary Stream Diversion 760 Tile Drains 46 Timber Fabrication and Installation 83 Topsoiling 26 Traffic Control 9 Treatment of Rock Surfaces 63 Use of Grasses for Streambank Stabilization 751

get price

Construction Specification 42—Concrete Pipe Conduits and ...

543—Nonreinforced Concrete Pipe (concrete irrigation pipe, drainage pipe, and drain tile) Portland cement concrete for bedding and cradles shall conform to Construction Specifica-tion 31, Concrete for Major Structures, or Con-struction Specification 32, Structure Concrete. 3. Included items Items to be included in contract specifications

get price

Construction Specification 45—Plastic Pipe

The concrete for the encasement shall conform to the requirements of Construction Specification 32, Structure Concrete, for Class 3000M concrete unless otherwise specified. 9. Joints Unless otherwise specified in section 14 of this specification or shown on the drawings, joints shall be

get price

Construction Specification - Structure Concrete

Construction Specification 32. STRUCTURE CONCRETE . 1. SCOPE. The work shall consist of furnishing, forming, placing, finishing, and curing portland cement concrete as required to build the structures described in Section 24 of this specification.

get price

Construction Specification 32—Structure Concrete: 1. Scope ...

This specification shall be used for all reinforced concrete within the Construction Plans. Reinforcing steel shall be US Grade 60, or higher, deformed bars. Reinforcing steel shall be free from loose rust, concrete, form oil, grease, paint, or other deleterious coating.

get price

Gypsum Wash Debris Basin Rehabilitation

May 16, 2019  Construction Specification 32—Structure Concrete Construction Specification 34—Steel Reinforcement Construction Specification 35—Concrete Repair Construction Specification 61‐—Rock Riprap Construction Specification 81—Metal Fabrication and Installation Construction Specification 82—Painting Metalwork Construction Specification 93 ...

get price

STORAGE FACILITY- NURSERY SUBSTRATE Interim Standard

Construction Specification 32, Structure Concrete. Construction of concrete pads is not permitted where the seasonal high water table will be less than 1 foot below the bottom of the concrete. Slope concrete pad away from the entrance. Suggested grade of the concrete pad is 0.2 or 0.3 percent. Where concrete floors contact wooden walls or posts ...

get price

LIST OF CONSTRUCTION SPECIFICATIONS and

Construction Specification Name Number Stripping, Stockpiling, Site Preparation and 752 Spreading Topsoil Structure Concrete 32 Structure Removal 3 Temporary Stream Diversion 760 Tile Drains 46 Timber Fabrication and Installation 83 Topsoiling 26 Traffic Control 9 Treatment of Rock Surfaces 63 Use of Grasses for Streambank Stabilization 751

get price

Construction Specification 21—Excavation

the standard specification includes more than one method. n. Requirements for concrete to fill voids from overexcavation (refer to Construction Specification 31, Concrete for Major Struc-tures, or 32, Structure Concrete) if require-ments in section 8 are not adequate. 4. Methods Section 4, Use of excavated materials

get price

Construction Specification 42—Concrete Pipe Conduits and ...

543—Nonreinforced Concrete Pipe (concrete irrigation pipe, drainage pipe, and drain tile) Portland cement concrete for bedding and cradles shall conform to Construction Specifica-tion 31, Concrete for Major Structures, or Con-struction Specification 32, Structure Concrete. 3. Included items Items to be included in contract specifications

get price

GRADE STABILIZATION STRUCTURE - USDA

CONSTRUCTION SPECIFICATION. GRADE STABILIZATION STRUCTURE (No.) CODE 410 . SCOPE . This item shall consist of all work necessary for the installation of the grade stabilization structure to the lines and grades shown on the drawings. Construction operations shall be carried out in such a manner that erosion, air,

get price

Uses for steel mill scale concrete

Construction Specification 32—Structure Concrete. Construction Specification 432—Structure Concrete Steel Reinforcement ... Fly ash used a partial substitution of Portland cement shall conform to the ... When placed, reinforcing bars shall be free from loose, flakey rust, mill scale, oil, grease,... More details » Get Price

get price

Attachment_1_-_Specifications.pdf - GovTribe

Attachment 1 - Specifications. Federal Agency Headquarters (USDA - NRCS) Federal Contract Opportunity Emergency Watershed Protection (EWP) Jones

get price

Experimentalexperimental Investigation On Steel Slag And ...

Construction Specification 32—structure Concrete Before steel is placed the surface of the bars shall be cleaned to remove loose rust mill scale oil grease or other foreign substances bars of specified size shall be accurately placed as shown on the drawings and shall be securely tied in position to prevent its displacement during the ...

get price

irrelevant TS’s are eliminated the final TS’s shall be ...

The comprehensive set of Technical Specifications (TS) that follow are generally what the City of Carmel requires on any project. All projects will not require every single TS so these should be reviewed as follows: 1. Relevance – if the TS is not relevant to the project it shall be eliminated. Once all of the

get price

Concrete Footing: How Thick Should it Be?

They are made not less than 1 1/2 times the projection of the slab beyond the face of the pier or column or the edge of the baseplate of a steel column. It should in no case be less than 150mm thick. As in the case of strip footings, when a column base is very wide, a reduction in thickness may be effected by reinforcing the concrete.”.

get price

ADDENDUM NO. 1

c. Added Section 9 to Specification 7 – Construction Surveys d. Added Section 8 to Specification 11 – Removal of Water e. Added Section 10 to Specification 21 – Excavation f. Added Section 10 to Specification 23 – Earthfill g. Deleted Specification 24 - Drainfill h. Added Section 24 to Specification 32 – Structure Concrete i.

get price